Answered 24/7 · All 67 Florida counties · Se habla español

Permitting · Plans & Drafting · Engineering · All 67 Florida counties

We engineer it. We draw it. We permit it.

A full-service Florida permitting company with an in-house drafting and design team and an in-house engineer. We prepare the drawings, seal them, file the application, and work the comments until the permit is issued. When a reviewer flags something, we fix it ourselves — no waiting on an outside consultant.

  • Permit filing, plan review tracking, revisions and closeout — start to finish
  • Drafting and design in house, signed and sealed by our own engineer
  • Licensed private provider: skip the county plan review queue
  • After-the-fact and expired permits — the files other people decline

Get my permit moving

One form. We will tell you which jurisdiction controls it and what it takes.

We respond within 30 minutes, day or night. No obligation, and we answer with a straight assessment — including when you do not need us. Or call (866) 314-6931.

5,000+Permits & projects handled
67Florida counties served
400+Municipalities filed in
15+Years in Florida permitting

What we do

Plans, engineering and permits — one firm

We draw it, our engineer seals it, and we file it. Whatever stage your project is at — not yet drawn, stuck in review, already built without a permit, or held up at closing — moving it forward should not take four separate vendors.

Plans & Engineering

Residential and commercial plan sets, MEP, structural, site plans, as-builts and engineer letters — our largest department, all in house.

See the service

Urgent Permit Rescue

Permit denied, stop work order, expired permit, code violation or a closing held up. Same-day triage, answered seven days a week.

See the service

Drafting Only

Already have an engineer or contractor? We draw the permit set and stop there. Your seal, your project, your client.

See the service

Permit Facilitation & Filing

You have a crew scheduled, a client asking for dates, and a permit sitting in a queue you cannot see. We file it, we track it, and we tell you where it stands.

Learn more

Private Provider Plan Review

Florida law lets you hire a licensed private provider to perform your plan review instead of waiting in the building department queue.

Learn more

40-Year Recertification & Milestone

A recertification notice arrives with a deadline attached, and missing it escalates fast — unsafe structure notices, fines and worse.

Learn more

After-the-Fact & Expired Permits

Work done without a permit. A permit that expired before it was closed out. A permit an old contractor opened and walked away from.

Learn more

Code Compliance & Violations

A code enforcement case does not pause while you decide what to do about it. In many Florida jurisdictions the fines run daily.

Learn more

Asbestos, Mold & Environmental

Most demolition and renovation permits in Florida stall on the same thing: the building department wants an asbestos survey first.

Learn more

How it works

Four steps, and we do all four

Most permit delays are not caused by the building department. They are caused by an incomplete submittal, a lapsed registration, or a comment that sat on somebody's desk for two weeks. All three are preventable.

STEP 01

Tell us the address and the problem

One call or one form. We identify which building department, planning office, fire marshal, health department or state agency actually controls your project — including which of the 400+ Florida municipalities you are really in, which is not always obvious near city lines.

STEP 02

We review the file before it goes in

Most permit delays are not caused by the building department. They are caused by an incomplete submittal that gets kicked back. We check the package against that jurisdiction's current checklist, confirm your license and municipal registration are active, and fix the gaps before filing.

STEP 03

We file and we track it

We submit through the correct portal, pay the fees, and follow the file. You get status updates without having to call anyone. When review comments come back, our own engineers and drafters make the correction and we turn the resubmittal around fast — usually the same day — because a missed cycle can cost weeks.

STEP 04

We close it out

Approved permit in hand is not the finish line — an unclosed permit becomes tomorrow's problem at closing. We chase the corrections and drive the permit to final so it is closed on the record.

Who we work with

Built around how your business actually runs

General Contractors

Your project manager should be running the job, not refreshing a permit portal. We take the whole permitting function off your desk.

See how we help

Roofing Contractors

Roofing is a volume business with a permitting problem: high permit counts, tight weather windows and product approval paperwork on every single file.

See how we help

Solar Contractors

In solar, permit turnaround is the business model. Every day between contract signature and installation is a day of financing cost.

See how we help

Pool & Spa Contractors

Pool permitting sits at the intersection of building, zoning, health and safety code — which is why a job that should take six weeks often takes twelve.

See how we help

Realtors & Title Companies

You did nothing wrong. The lien search found a permit from 2018 that nobody knew about, and now a closing that was routine on Monday is on hold.

See how we help

Homeowners & Owner-Builders

Most homeowners meet us on the worst day: a violation notice on the door, a permit discovered mid-sale, or work a previous contractor never closed out.

See how we help

Property Managers

Open permit audits across a portfolio, recertification deadlines, code violations and vendor work checked before it becomes yours.

How we help

Commercial Brokers

Pre-LOI feasibility on change of use, permit and violation due diligence, and build-out timelines that survive contact with a jurisdiction.

How we help

Restoration Companies

Emergency and repair permits, structural assessment, sealed letters for carriers and reconstruction plans drawn in house.

How we help

Why contractors call us

Florida only. Every day. That is the whole point.

Engineering and permits, one roof

Most permit companies stop when a comment needs a drawing changed. We do not — the engineers, the drafters and the permit techs all work here. Signed and sealed drawings, as-builts, revisions and the filing itself, without a handoff.

Florida only, and that is the point

We do not file in fifty states. We file in Florida, every day, which is why we know that Tampa and Hillsborough County run separate portals, that Pinellas licenses trades through PCCLB rather than DBPR alone, and that a Miami-Dade product approval is not the same thing as a statewide one.

You get a person, not a ticket number

Every project has a named specialist who knows the file. When you call, you talk to someone who can tell you exactly where it stands without looking it up.

We take the ugly ones

Expired permits. Work done without a permit. Code enforcement liens accruing daily. Permits an old contractor abandoned mid-project. These are the files other people decline, and they are a large part of what we do.

Se habla español

Full Spanish-language support across intake, filing and inspection coordination.

What clients say

Rated 5.0 on Google

5.0★★★★★
16 Google reviews · view on Google
★★★★★
1Contractor Solutions made our permitting process quick and painless. They knew exactly what to do, kept us updated, and got everything approved without the usual headaches. Highly recommend
ChaseJune 2026 · Verified Google review
★★★★★
I had an excellent experience working with 1 Contractor Solutions. They guided me through the entire permit and variance approval process with professionalism, expertise, and clear communication every step of the way.
Jamie GrantMay 2026 · Verified Google review
★★★★★
Amazing team to work with — fast, reliable, knowledgeable, and most importantly, honest. Their professionalism and attention to detail made the entire process smooth and efficient. I highly recommend them to anyone looking for quality service and a team they can truly trust.
Nicolas AvilaMay 2026 · Verified Google review

All reviews and the kinds of files we handle →

Where we work

Every county in Florida, with real depth on the Suncoast

We file statewide. Our deepest bench is Sarasota, Manatee, Charlotte and Tampa Bay — the jurisdictions we are in weekly, where we know which reviewer wants what.

Florida permitting questions, answered

What is a permit expediter, and what does one actually do?

A permit expediter — sometimes called a permit runner or permit puller — manages the permit application process on your behalf from intake to final close-out. That means assembling and reviewing the submittal package before it goes in, filing it with the correct department, tracking it through plan review, responding to review comments, coordinating revisions and resubmittals, and closing the permit out at the end. We design it, we draw it, and we file it — so when a reviewer comments, it comes back to us and not to an outside consultant. The construction itself is performed by your crew.

How much does permit expediting cost in Florida?

Pricing depends on the jurisdiction, the permit type, and how much of the file already exists. Straightforward residential filings sit at the low end; multi-agency commercial packages, after-the-fact permits and code violation resolutions cost more because they take more work. We quote a flat professional fee up front, separate from the government fees the building department charges, so you know both numbers before we start. Call (866) 314-6931 and we will scope it on the phone.

How long does a building permit take in Florida?

Broadly: simple residential trade permits run about two to six weeks in most jurisdictions; residential new construction and larger remodels run six to twelve weeks; commercial projects run eight to sixteen weeks or longer where multiple agencies review in sequence; after-the-fact permits and code compliance cases run eight to sixteen weeks because they include an investigation phase. Those are ranges, not promises — the single biggest variable is whether your submittal is complete on the first pass.

Do you work in my county?

Yes. We file in all 67 Florida counties and more than 400 municipalities. Our deepest bench is on the Suncoast — Sarasota, Manatee, Charlotte and Lee — plus Tampa Bay, but we handle Miami-Dade, Broward, Palm Beach, Orange and Duval work daily.

Can you pull a permit under my contractor's license?

Both ways, depending on what suits your project. We can file as your authorized agent under your license and qualifier with signed authorization on file, or we can pull the permit under our own license as authorized agent so you do not have to be registered in that jurisdiction at all. That second option is worth knowing about if you are working outside your usual area — it removes the registration problem entirely. We also keep your own licenses, registrations and insurance certificates current in every jurisdiction you file in.

What is an after-the-fact permit?

It is a permit issued for work that was already performed without one. Florida jurisdictions generally allow it, but the process is different from a normal permit: there is usually an investigation fee, often at a multiple of the standard permit fee, the work may need to be exposed for inspection, and you may need sealed drawings or an engineer's letter certifying what was built. It is resolvable. It is not fast, and it gets worse the longer it sits.

See all frequently asked questions →

Ready to get your permit moving?

One call tells you which jurisdiction controls your project, what it will take, and what it will cost. Most of the time we can scope it on the phone.

Call NowFree Quote